Which LIMS software solutions are on the market?

Technical test lab with modern measurement technology – engineer analyzes test data digitally and documents results in the LIMS.

Once it is clear that a laboratory management system is needed, the question of the right software follows. Which LIMS software solutions are there for technical testing laboratories — and why does none of them fully meet the need?

This overview sets out the routes that testing laboratories take in practice.

Why there is no standard software for technical testing laboratories

When people think of laboratories, they usually think of analytical laboratories in medicine or the food industry. For those laboratories there is a wide choice of laboratory information and management systems developed precisely for them. The market is large because there are many analytical laboratories.

The number of technical testing laboratories, by contrast, is small, and their requirements are highly specific. That low demand feeds straight through to the supply: there is no standard software for technical testing laboratories. Some testing laboratories therefore turn to a LIMS from the analytical world. The experience of many dacore customers shows that these solutions do not meet the needs of a technical testing laboratory.

The difference lies in the subject matter itself: a technical testing laboratory does not examine samples but test items — components, devices, materials. It does not manage reagents but measuring equipment with calibration intervals. And at the end there is no certificate of analysis but a test report to a standard. A LIMS for analytical laboratories is not built for that chain.

In-house databases built on Excel and Access

Many testing laboratories therefore work with databases they have built themselves on Excel, Access or SharePoint, sometimes extended by their own web front end with measurement data capture attached.

These solutions often require the same data to be maintained in several places. Because they cover many different data sources, they are prone to error and traceability is not assured. At the latest when the colleagues who set the database up leave the company or retire, the dependency becomes clear. And as soon as further applications are added, duplicate maintenance is hard to avoid.

Partial solutions from the standard market

Some laboratories work with the QM modules and inventory management in SAP, or with Microsoft Project. For individual areas such as CRM, project management or document management there is a wide choice of standard software.

A testing laboratory's whole process can in principle be covered that way. But no laboratory needs the full scope of any one of those tools, and the partial solutions of different suppliers can rarely be connected to each other in any useful way.

There is an organisational effect on top of that: in many companies each department looks for its own solution without considering how it connects to the rest. The result is that sales planning and laboratory planning do not fit together.

Standard software has to be configured

Standard software sounds at first as though you only have to press a button. It is not that simple: standard applications are configured too, as a rule. Those adjustments always stay within what the software manufacturer has provided for. If the manufacturer does not specialise in technical testing laboratories, the result is a lengthy consulting process.

Custom extensions later cause problems at every update, because afterwards they no longer fit and have to be configured again at every release. That makes running a standard solution hard to plan.

Custom-developed solutions

For the specific requirements of technical testing laboratories, then, what the standard market offers does not convince. As an alternative, dacore develops laboratory management systems individually.

dacore knows the processes of technical testing laboratories in detail. On the basis of the TestLab Plus base package, a tailored system is built together with the laboratory.

At the end of the project there is a laboratory management system with all the interfaces required, to an ERP system for example. If adjustments are to follow later, work can resume at the point where the project finished. There are no forced updates.

The route there

What that path looks like with a custom-built solution – process, duration and prices – is set out under LIMS implementation in test labs.