Process & costs
Three routes from starter package to go-live — effort, duration and costs at a glance.
After the product demo
A successful implementation is based on a clear approach. After a product demo, dacore offers three options.
The most efficient way to implement software
For a detailed requirement specification
For optimized lab processes + requirement specification
Regardless of the approach chosen, implementation is iterative – from configuration and training to interfaces for a successful go-live.
Technology
Our LIMS solutions adapt flexibly to your IT landscape.
Local server operation with maximum data security
For browser-based access
APIs and integrations with ERP, CAQ or ticketing systems (e.g. SAP, MS Dynamics, Jira) as well as bidirectional data exchange
All our systems are based on AI-enabled SQL databases from Microsoft
Gradual implementation instead of overload from too many topics
Clear responsibility from management and executive leadership
Transparent involvement of the team, with clear added value
Early involvement of related departments such as IT, QM, R&D and production
FAQ
After the product demo there are three routes: agile onboarding, with the system going live directly; a delta analysis producing a requirements specification; or a proof of concept with process optimization first. Whichever route is chosen, implementation runs iteratively — from configuration through training to interfaces — and ends with the go-live.
A sound requirements specification describes the laboratory's own processes, not the software features wanted. It is based on comparing existing workflows with what a standard system already provides. At dacore the specification is produced in the delta analysis — a two-day workshop — or in the proof of concept, where lab processes are optimized beforehand.
A two-day workshop that determines the difference between the starter package and the laboratory's actual processes. The result is a requirements specification setting out what needs to be adapted before implementation begins. It requires the product demo and a completed checklist.
Ten online tutorials over eight weeks in which ideal lab processes are defined and documented in a requirements specification. Unlike the delta analysis, the result is not only the specification but also a revised process. This route suits laboratories that want to improve their workflows before digitizing them.
It depends on the route chosen and the extent of adaptation needed. Before the decision, the options involve a demo with a checklist, a two-day workshop or eight weeks of online tutorials. Implementation itself runs iteratively: configuration, training, interfaces, go-live. Introducing the system step by step works better than tackling too many topics at once.
Legacy data is reduced before migration to what the new system actually needs — typically master data for customers, test items and measuring equipment, plus completed test reports. An import tool is available for the transfer itself. The scope is defined during the implementation project and belongs in the requirements gathering, because it has a noticeable effect on effort and schedule.
In the demo we show TestLab Plus using your own test workflows.