With standard software, the limits of what can be configured – and which processes cannot be mapped cleanly – usually become apparent only after the licence has been bought. At dacore, consulting therefore comes at the start of every project: before the contract, not after it.
A project begins by clarifying the task itself: existing processes, systems already in place, current difficulties, specific requirements. The specification grows out of that.
Three routes into implementation
Three options are available for getting started. They differ in depth and in what they produce:
- Agile onboarding — TestLab Plus base package goes live directly. Specification and configuration emerge over six to eight workshops, following the laboratory’s real processes.
- Delta analysis — a two-day workshop in which the base package is presented and tested. The result is a requirements specification covering the delta between the base package and the laboratory’s processes.
- Proof of concept — a series of eight workshops in which a full specification is developed from practical examples. The result is a requirements specification with a fixed price.
Process, duration and costs of all three options are set out under LIMS implementation in test labs.
In all three options, functions and development possibilities are shown using anonymised examples from existing customers. That gives a concrete picture of what a custom-developed LIMS can do, well before any decision is taken. The contract follows afterwards.
This calls for involvement: what the LIMS should look like cannot be delegated. That effort comes before the contract is signed — with standard software, individual functions are specified only after purchase, during the configuration phase.
The stated reason is rarely the cause
The most common reason for implementing a LIMS is trouble with scheduling and resource planning. Targeted questions in the workshops usually trace the cause elsewhere: gaps in the test item process that feed through to deadlines, or a test structure that rules out clean resource planning from the outset.
As a result, hardly any project develops exactly as planned. That flexibility is deliberate — solutions that hold up in daily work do not come about any other way.
Setting expectations is part of the consulting
Consulting includes establishing what a LIMS can improve and what it cannot. Some laboratories need no more than a rough overview of their resource planning; others find that detailed planning would require additional staff.
Many projects start with ideas for solutions that miss the actual causes. The consulting process turns those ideas into concrete requirements. One example from a customer relationship spanning more than twenty years: the original request was to analyse calibration data from measuring equipment. That module still does not exist — the consulting established that the priorities lay elsewhere. Addressing them improved the processes far more than the original request would have.
With standard software, readjusting in this way as a project progresses is possible only to a limited extent, if at all.
Practical example: test report generation
Report generation ties up a great deal of resource. In practice, the test report is often produced five to six weeks after the test itself — by which time records are incomplete and the documentation is untidy.
A test report at the push of a button is achievable, but it requires complete and consistent data throughout the testing process. One customer has implemented exactly that; it took three to four years of project work, because so many components feed into that one function.
There is a great deal of ground between nought and a hundred per cent. For many laboratories, automating parts of the process or putting clean document management in place is already enough.
Consulting does not end at go-live
Once the first version is live, it is worth running it in day-to-day laboratory work before adjustments and further development are decided. The project managers remain available after the project closes — either through a support and innovation budget billed by the hour, or through a new quotation.
This support phase is optional. Extensions remain possible after long gaps: with some laboratories, the LIMS has been developed further continuously for more than twenty years.
Exchange between testing laboratories
Alongside direct consulting, laboratories exchange experience with one another — at the lab management conference, in webinars and through other formats. The focus each time is on the processes of technical testing laboratories and on concrete practical examples. Ideas that emerge in conversation between practitioners can then be implemented in a custom-developed system.
Arrange a consultation
Consulting before and during a project decides whether a LIMS implementation succeeds. How consulting is built into the implementation options, from delta analysis to proof of concept, is set out under LIMS implementation in test labs.
The starting point is a demo of TestLab Plus based on your own test procedures.